Approximately 3,402,028 SF Type IA, concrete tilt-wall building for sortable fulfillment center. Five (5) level structures within the building to be used for manual and automated storage of goods.
Location:Otay Mesa, CA
General Contractor:Clayco Corporation
Architect:Ware Malcomb
Owner/CM:Seefried Properties
HVAC SYSTEM:HVAC system includes (109) roof top units ranging 25 - 7.5 tons, smoke relief fans, DDC Controls, and MDF Computer Room A/C systems. (46) VRF, multi-zone and split system heat pumps, ductwork with insulation, drum diffusers, and air distribution devices. A helicopter was used to place the Roof Top Units.